To connect Dhaka, the capital of Bangladesh, with the port city Chittagong there are 3 ongoing projects to improve the National Highway no. 1. After widening the highroad, three bridges... read more →
2009-2018. Victoria Underground Station Upgrade, London, UK Victoria underground station is at the heart of London's transport network and is one of the busiest and most congested stations, used by around... read more →
2017, November. As part of the residential development of the Sky Tower on the southern coast of Cyprus, dynamic load testing was performed by professional local engineers with the Profound... read more →
2014 - ongoing. Profound has supplied a large quantity of Liquid Levelling Sensors as part of the geotechnical and structural monitoring solution to the San Francisco Municipal Transportation Agency's Third Street... read more →
2015. A fully monitored excavation test on scale was performed for the Oosterweeltunnel in Antwerp, Belgium in order to assess soil behavior and specific techniques to be used in a later... read more →
2006 - ongoing. Due to the ever increasing traffic, the existing Penang Bridge had to be expanded from dual-2 lane to dual-3 lane with the structural widening of 4.80 m both... read more →